Green hydrogen site screener: score any location 0–100

The HYZEN Site Screener gives a first read on any location for a green hydrogen project. Click a point on the map and it looks up public data for that point: solar and wind resource, rainfall and distance to the coast for water, distance to the electricity grid and to the nearest port, and whether the point sits inside or near a protected area.

Each factor becomes a sub-score from 0 to 100, and the six combine into one overall suitability score with a short label, from low to exceptional suitability. A written summary explains the result. Use it to compare candidate sites and build a shortlist before spending on detailed studies.

How the score works

Sub-scoreWhat it measuresSource
SolarLong-term average annual solar irradiation on a horizontal surfaceNASA POWER
WindLong-term average wind speed at 50 m above groundNASA POWER
WaterThe more favourable of distance to the coast or annual rainfallNatural Earth coastlines, NASA POWER
GridDistance to the nearest mapped substation or high-voltage lineOpenInfraMap (OpenStreetMap data)
LogisticsDistance to the nearest portNGA World Port Index
EnvironmentalWhether the point is inside or near a protected areaWDPA (UNEP-WCMC)

The overall score is a weighted combination of the six sub-scores. PVGIS also supplies an estimated annual PV yield, shown in the results; it does not change the solar sub-score. The Screener ranks suitability and does not calculate the levelized cost of hydrogen, costs or full-load hours.

Worked example: Dakhla, Morocco

A screen of 23.70° N, 15.93° W, on the Dakhla peninsula, run on 26 October 2026, scored 88 / 100 (Exceptional).

Solar
85
Wind
73
Water
95
Grid
94
Logistics
95
Environmental
92

Scores can change when the public datasets are updated. Re-run the point on the map above for the current result.

Frequently asked questions

Is the Site Screener free?

Yes. You can run 3 screens per day in each browser, with no account.

What data does it use?

NASA POWER for solar, wind, temperature and rainfall; PVGIS (EU JRC) for an estimated PV yield; OpenInfraMap (OpenStreetMap data) for the grid; the NGA World Port Index for ports; Natural Earth for the coastline; and the WDPA for protected areas.

Does it calculate LCOH or project cost?

No. The Site Screener ranks site suitability. It does not calculate LCOH, costs or full-load hours. Any cost figure in the AI-written summary is not calculated by the Screener.

How accurate is the score?

It is a first filter, not a site study. Resource figures are long-term averages, not measurements at the site. Distances are straight lines to the nearest mapped feature, and mapped grid data can be incomplete. If a lookup fails, that sub-score uses a neutral midpoint and the result says which data was unavailable.

What comes after the screen?

Use the score to shortlist sites. Electrolyzer sizing, LCOH modelling and pre-FEED engineering are what the HYZEN platform is built for, and it is in early access.

More on the method and its limits: Site Screener in the Resource Center. Back to the map ↑