How hyzenergy.com and the Hyzen platform use cookies and similar tracking technologies, and how to manage your preferences.
This Cookie Policy explains how HYZEN Solutions SASU (“Hyzen,” “we,” “us,” or “our”) uses cookies and similar tracking technologies on our website (hyzenergy.com and its subdomains) and our SaaS platform (the “Service”).
This Policy should be read together with our Privacy Policy and our Legal Notice.
Strictly necessary storage is always active. Analytics cookies are only set if you accept them in the cookie banner. You can change your choice at any time using the “Cookie Settings” link in the footer.
Cookies are small text files placed on your device (computer, tablet, or smartphone) when you visit a website. They are widely used to make websites work efficiently, provide information to website owners, and enhance the user experience.
Similar technologies include web beacons (pixel tags), local storage, and session storage. For simplicity, we refer to all of these technologies as “cookies” in this Policy.
These are essential for the Service to work and do not require consent. They are not used for tracking.
| Name | Type | Purpose | Duration |
|---|---|---|---|
cookie_consent | First-party cookie | Stores your cookie choices | 12 months |
hz_screener_usage | Local storage | Counts daily Site Screener usage to apply the free usage limit | Persistent, resets daily |
scrollTarget | Session storage | Remembers which section to scroll to after navigating | Until the tab closes |
These cookies help us understand how visitors use the Service through anonymous statistics. Google Analytics is only loaded after you opt in, and it is disabled by default. If you withdraw consent, the cookies below are deleted from your browser.
| Cookie Name | Provider | Purpose | Duration |
|---|---|---|---|
_ga | Google Analytics | Distinguishes unique users | 2 years |
_ga_[ID] | Google Analytics | Maintains session state | 2 years |
We do not currently use marketing or advertising cookies. If that changes, they will require separate consent and this Policy will be updated first.
Some cookies are placed by third-party services that appear on our pages. We do not control the cookies set by these third parties. Please review their respective privacy policies:
| Third Party | Purpose | Privacy Policy |
|---|---|---|
| Google Analytics | Website analytics | policies.google.com/privacy |
| Mapbox | Interactive maps | mapbox.com/legal/privacy |
| Anthropic | AI features | anthropic.com/privacy |
When you first visit our Service, a cookie consent banner is displayed, allowing you to:
You can change your cookie preferences at any time by:
In compliance with the GDPR and the ePrivacy Directive, non-essential cookies are only placed on your device after you have given your active, informed, and freely given consent. Consent is not a precondition for accessing the Service.
In compliance with Loi 09-08 and applicable CNDP guidelines, we obtain consent for cookies and tracking technologies that are not strictly necessary for the operation of the Service.
Most web browsers allow you to manage cookies through their settings. You can typically:
Browser-specific instructions:
Please note that blocking or deleting cookies may affect the functionality of the Service. Strictly necessary cookies cannot be disabled without affecting core features.
Some browsers include a “Do Not Track” (DNT) feature. We currently do not respond to DNT signals, as there is no industry standard for interpreting such signals. However, you can manage cookies through the consent mechanisms described above.
We may update this Cookie Policy from time to time to reflect changes in the cookies we use, changes in technology, or legal requirements. The “Last Updated” date at the top of this page indicates when this Policy was last revised.
Material changes will be communicated through the cookie consent banner or by email.
For questions about this Cookie Policy, please contact us:
Cookies on HYZEN
We use strictly necessary storage to run the site. With your permission we also use Google Analytics to understand how the site is used. Nothing analytical loads until you choose. See our Cookie Policy.