Site ownership, terms of use for the Site Screener, intellectual property, and liability terms governing hyzenergy.com.
This website (hyzenergy.com and its subdomains) is owned and operated by:
Contact: contact@hyzenergy.com
This website serves as an informational presentation of Hyzen and its technology platform for green hydrogen project engineering. It also provides access to a free interactive site screening tool (the “Site Screener”) that generates preliminary feasibility indicators for green hydrogen projects at user-selected locations.
The website does not currently offer paid products, subscriptions, or commercial transactions. When commercial services become available, separate terms of service will govern their use.
The Site Screener is a free, publicly accessible tool that allows users to select a geographic location and receive preliminary indicators about that location's suitability for green hydrogen production. These indicators may include estimated solar irradiation, wind resource quality, water availability proximity, infrastructure access, and indicative Levelized Cost of Hydrogen (LCOH) ranges.
The Site Screener outputs are preliminary, indicative estimates intended for initial screening purposes only. They are generated using mathematical models, publicly available datasets (including but not limited to PVGIS, NASA POWER, ERA5/Copernicus), and generalized engineering assumptions.
By using the Site Screener, you acknowledge and agree that:
The outputs are not engineering deliverables. They do not constitute a feasibility study, a pre-FEED assessment, an engineering opinion, or a professional recommendation of any kind.
The outputs are not investment advice. No financial, investment, construction, or operational decision should be made solely or primarily on the basis of Site Screener outputs.
The outputs involve inherent limitations. Engineering models are simplifications of complex physical, economic, and regulatory systems. Actual project conditions and performance will differ — potentially materially — from any estimate provided by the tool, due to factors including but not limited to: local meteorological variability, site-specific terrain and soil conditions, actual equipment performance and degradation, real-time commodity and energy prices, regulatory and permitting requirements, construction quality, and other factors not captured by the models.
The underlying data comes from third-party sources whose accuracy, completeness, and currency we do not guarantee. Users should independently verify all data relevant to any project decision.
Certain features use artificial intelligence (AI). AI-generated content may contain inaccuracies, incomplete information, or errors. AI outputs must not be treated as professional engineering or scientific advice.
You are solely responsible for any decision you make based on information obtained through the Site Screener. Any use of Site Screener outputs for project development, investment analysis, regulatory filings, financing applications, or any other professional or commercial purpose must be independently validated by qualified professional engineers and other relevant advisors.
The Site Screener may generate a downloadable report (the “Site Score Report”) summarizing the screening results for a selected location. This report includes an overall site suitability score and AI-generated analysis. The following additional terms apply specifically to the Site Score Report:
The Site Score Report is an AI-generated document. Its content — including the numerical score, the textual analysis, and any recommendations — is produced by artificial intelligence. It has not been reviewed, validated, or endorsed by a licensed professional engineer.
The site suitability score is a relative indicator, not an absolute determination. It reflects a weighted composite of publicly available data inputs — including renewable energy resource quality, proximity to water sources, infrastructure access, and other location-specific factors. The score does not account for all variables that affect actual project feasibility, including but not limited to: land ownership, environmental impact, permitting constraints, geotechnical conditions, political risk, or project-specific financial parameters.
The score is not a rating, certification, or endorsement. It does not certify that a location is suitable for development, nor does it predict the technical or financial success of any hydrogen project.
The Site Score Report is intended for internal screening purposes only. If you share the report with third parties — including investors, partners, lenders, regulatory bodies, or co-developers — you are responsible for communicating these limitations. Hyzen accepts no liability for decisions made by any third party based on a Site Score Report.
Each Site Score Report contains a disclaimer notice. Removing, obscuring, or altering the disclaimer on the report is prohibited.
Use of the Site Screener does not create a professional, advisory, consulting, or engineering services relationship between you and Hyzen. Hyzen is a software provider, not an engineering firm, and does not provide licensed professional engineering services.
To the maximum extent permitted by applicable law, Hyzen, its directors, officers, employees, and agents shall not be liable for any direct, indirect, incidental, special, consequential, or punitive damages arising from or related to:
your use of, or inability to use, this website or the Site Screener;
any reliance placed on information or outputs obtained through this website or the Site Screener;
any decisions — including investment, construction, development, or operational decisions — made on the basis of Site Screener outputs;
any inaccuracies, errors, or omissions in the outputs, underlying data, or AI-generated content;
any interruption, suspension, or discontinuation of the website or Site Screener;
any unauthorized access to or alteration of your data.
All content on this website — including text, graphics, logos, icons, images, data compilations, software, engineering models, algorithms, calculation methodologies, UI/UX design, the “HYZEN” trademark, and the overall design and structure of the website — is the exclusive property of Hyzen Solutions SASU or its licensors and is protected by Moroccan and international intellectual property laws.
No part of this website may be reproduced, distributed, modified, transmitted, displayed, published, or exploited in any form without the prior written consent of Hyzen, except for personal, non-commercial viewing.
Certain data, images, and content displayed on the website may belong to third parties (including map data from Mapbox, resource data from PVGIS and NASA POWER, and open-source software components). Such content remains the property of its respective owners.
If you submit any information through forms on this website (contact forms, newsletter signup, feedback), you retain ownership of that content but grant Hyzen a non-exclusive, royalty-free license to use it for the purpose for which it was submitted (responding to your inquiry, sending you communications you opted into, etc.).
When using this website and the Site Screener, you agree not to:
Hyzen Solutions reserves the right to restrict or terminate access to the website for any user who violates these terms.
This website may contain links to third-party websites or resources. These links are provided for convenience only. Hyzen does not control, endorse, or assume responsibility for the content, privacy practices, or availability of any third-party websites. Accessing linked websites is at your own risk.
Hyzen makes reasonable efforts to keep the website and Site Screener available but does not guarantee uninterrupted or error-free access. The website or Site Screener may be temporarily unavailable for maintenance, updates, or reasons beyond our control. Hyzen may modify, suspend, or discontinue the website or Site Screener at any time without prior notice.
The collection and processing of personal data through this website is governed by our Privacy Policy and our Cookie Policy, in compliance with Moroccan Law 09-08 and, where applicable, the EU General Data Protection Regulation (GDPR).
This Legal Notice is governed by and construed in accordance with the laws of the Kingdom of Morocco. Any dispute arising from or related to this website or the Site Screener shall be subject to the exclusive jurisdiction of the commercial courts of Rabat, Morocco.
Hyzen reserves the right to modify this Legal Notice at any time. Changes take effect upon publication on this page. The “Last Updated” date above indicates the most recent revision. We encourage you to review this page periodically.
For any questions regarding this Legal Notice, please contact:
Cookies on HYZEN
We use strictly necessary storage to run the site. With your permission we also use Google Analytics to understand how the site is used. Nothing analytical loads until you choose. See our Cookie Policy.