About Hyzen

We know what a green hydrogen feasibility study actually looks like.

17 tabs · 3 tools · $200,000 · 6 months

Not the polished version in the executive summary. The real version: the one with seventeen spreadsheet tabs, three incompatible simulation tools, a HOMER Pro file nobody on the team fully trusts, and a consultant study that cost $200,000 and took six months to tell you what you already suspected.

We’ve lived that process. We’ve built plants on Excel models that broke when someone changed a cell reference. We’ve watched promising projects stall, not because the physics didn’t work, but because the engineering team couldn’t move fast enough to stay ahead of the decision-makers.

That’s what Hyzen is built to fix.

Green hydrogen is not a software problem yet solved.

The tools the industry runs on today were built for petrochemicals, adapted reluctantly for hydrogen, and layered on top of each other with no shared data model. An electrolyzer vendor uses different assumptions than the EPC firm. The EPC firm uses different numbers than the project developer. Nobody knows whose LCOH to trust.

This fragmentation isn’t an inconvenience. It’s costing the industry years. Projects that should reach pre-FEED in three months are taking twelve. Capital decisions are being made on numbers that don’t agree with each other.

An electrolyzer vendor. The EPC firm. The project developer.

Hyzen is built from scratch, not adapted from anything else, around the specific physics, economics, and regulatory logic of green hydrogen. Every calculation is part of one connected chain. Change a location, a technology, a capacity assumption. Every downstream number updates immediately, automatically, in a way a process engineer can defend.

Fig. 1
HQRabat, Morocco

34.0037° N
6.8513° W

Built in Morocco. Deployed for the world.

We’re headquartered in Rabat, at the doorstep of one of the most ambitious green hydrogen corridors on the planet. Morocco’s solar irradiation, Atlantic wind resources, port infrastructure, and proximity to European offtake markets make it a natural proving ground. The engineering decisions we validate here (what drives LCOH in a hybrid PV-wind system, what RFNBO compliance really requires at the project level, what it takes to make an ammonia project bankable) travel everywhere.

Our models are informed by peer-reviewed research from Moroccan research teams with real operational data from projects on the ground. We don’t cite papers we haven’t read.

Who Hyzen is for.

If you size electrolyzers, evaluate project feasibility, structure H₂ project finance, advise developers on technology selection, or set engineering standards for a national energy agency, Hyzen was designed for you.

Not for general audiences. Not for clean energy curiosity. For the people in the room when the numbers need to be right.

Early access.

Hyzen is currently in early access with a small group of engineers and developers. We’re not in a hurry to scale before the product earns it.

Request early access →