Green hydrogen glossary
Plain-language definitions of the terms behind green hydrogen plant design and cost, grouped A to Z and by plant category.
30 terms shown
A
- AACE Estimate ClassesEconomics
AACE estimate classes rank capital cost estimates from Class 5 (concept screening) through Class 4 (feasibility) to Class 1 (check estimate), each with a typical accuracy range.
- AdditionalityRegulation
RFNBO additionality requires the power behind EU-compliant hydrogen to come from new, unsubsidised renewables, in operation no earlier than 36 months before the electrolyzer (Art. 5, Reg. 2023/1184).
Alkaline water electrolysis (AWE) splits water into hydrogen and oxygen in an alkaline electrolyzer filled with liquid potassium hydroxide; it is the longest-established electrolysis technology for large plants.
C
Electrolyzer capacity factor is the hydrogen a plant actually produces in a year divided by what it would produce running at full rated power every hour; it is one of the strongest levers on LCOH.
- CurtailmentRenewable input
Curtailment in green hydrogen is renewable electricity a solar or wind plant could produce but the electrolyzer cannot absorb, because power is above its rating or below its minimum load.
Cycles of concentration (COC) in a cooling tower is the ratio of dissolved solids in the circulating water to those in the make-up water; it sets how much blowdown is needed.
D
Delivered vs produced hydrogen is the gap between hydrogen leaving the stack and hydrogen reaching the offtaker after plant losses; a credible LCOH divides cost by delivered kilograms.
- Deoxo (Catalytic Deoxidation)Gas conditioning
A deoxo unit removes residual oxygen from electrolytic hydrogen by reacting it with hydrogen over a catalyst to form water; in deoxo hydrogen purification, the dryer then removes that water.
G
Gas crossover is hydrogen leaking through the electrolyzer separator into the oxygen side; hydrogen in oxygen crossover sets the electrolyzer's safety trips and minimum load.
- Geographic CorrelationRegulation
RFNBO geographic correlation requires contracted renewable power to come from the electrolyzer's own bidding zone or a qualifying interconnected one (Art. 7, Reg. 2023/1184).
H
- Hydrogen CompressionCompression
Hydrogen compression raises hydrogen from electrolyzer outlet pressure to storage, pipeline or process pressure; hydrogen compressor types include reciprocating, diaphragm and centrifugal machines.
- Hydrogen Purity GradesGas conditioning
Hydrogen purity grades are minimum quality specifications set by end use; for hydrogen purity, ISO 14687 defines them, with Grade D for PEM fuel-cell road vehicles requiring at least 99.97 %.
L
The levelized cost of hydrogen (LCOH) is the constant price per kilogram at which a hydrogen plant recovers all its discounted costs over its life; LCOH calculation uses discounted cash flow.
LHV vs HHV hydrogen efficiency is a choice of energy basis: 33.3 kWh/kg (lower heating value) or 39.4 kWh/kg (higher heating value), which changes one electrolyzer's quoted efficiency.
Loss of power supply probability (LPSP) is the share of demand an energy system fails to meet over a period; in hydrogen plants, it measures how much of the offtake goes unserved.
M
- Minimum Load (Turndown)Electrolysis
Electrolyzer minimum load is the lowest share of rated power at which the stack can run safely; below it, the unit must go to standby or shut down.
P
- P50 / P90 Energy YieldRenewable input
P50 and P90 solar and wind yield are annual energy estimates exceeded with 50 % and 90 % probability; lenders typically size project debt on the P90 value.
PEM electrolysis splits water using a solid proton exchange membrane as electrolyte; a PEM electrolyzer responds in seconds to power changes but relies on iridium and platinum catalysts.
- Polarization CurveElectrolysis
A polarization curve in electrolysis plots cell voltage against current density; it shows how much extra voltage, and so extra energy, each step up in hydrogen output costs.
- Pre-FEED and FEEDEconomics
A pre-FEED study and FEED are the front-end engineering stages that take a hydrogen project from a chosen concept to a design and cost estimate firm enough for investment.
R
Renewable fuels of non-biological origin (RFNBO) are the EU category for fuels, such as green hydrogen, whose energy comes from renewables other than biomass; only RFNBOs count toward EU targets.
S
Solid oxide electrolysis (SOEC) splits steam at high temperature on a ceramic electrolyte; an SOEC electrolyzer uses less electricity per kilogram than AWE or PEM when external heat is available.
Electrolyzer specific energy consumption (SEC) is the electricity, in kWh/kg, needed to produce one kilogram of hydrogen, measured either at the stack or for the whole system.
- Stack DegradationElectrolysis
Stack degradation is the gradual loss of electrolyzer cell performance over operating time, usually given as an electrolyzer degradation rate in %/1,000 h or µV/h of cell voltage rise.
T
- Temporal CorrelationRegulation
RFNBO temporal correlation requires hydrogen to be produced in the same period as its renewable power: monthly until 2029, then hourly matching from 2030 (Art. 6, Reg. 2023/1184).
TSA drying removes water vapour from hydrogen on adsorbent beds that are regenerated by heating; TSA vs PSA hydrogen drying is a trade-off between heat demand and hydrogen loss.
U
Ultrapure water is the deionised feed an electrolyzer needs; water treatment for electrolysis typically chains reverse osmosis (RO) and electrodeionization (EDI) to remove salts that would damage the stack.
W
- Water Intensity of HydrogenWater & cooling
Water intensity is how much water it takes to produce 1 kg hydrogen; electrolysis needs about 9 litres per kilogram for the reaction, and several times more once cooling is included.
WACC is the blended return a project must pay its lenders and equity investors; in a hydrogen project, WACC is the discount rate that turns upfront CAPEX into a cost per kilogram.
- Working InventoryStorage
Working inventory is the hydrogen a storage system can deliver between its maximum and minimum operating pressures; hydrogen buffer storage sizing is based on it, not on total gas held.