Hydrogen Purity Grades

Hydrogen purity grades are minimum quality specifications set by end use; for hydrogen purity, ISO 14687 defines them, with Grade D for PEM fuel-cell road vehicles requiring at least 99.97 %.

Gas conditioningLast reviewed by Soukayna Jermouni

In plain terms

"Pure hydrogen" has no single meaning. A fertiliser plant, a gas turbine and a fuel-cell truck tolerate very different impurities. ISO 14687 sets the minimum quality for each use. The 2025 edition replaced the 2019 edition.

The main grades in ISO 14687:2025:

GradeEnd use
AOther gaseous applications
DPEM fuel cells in road vehicles
EPEM fuel cells in stationary appliances
F-1, F-2Hydrogen combustion engines (new in 2025)

Typical range

Grade D requires a hydrogen fuel index of at least 99.97 %, so no more than 300 µmol/mol of total impurities, as applied in California's hydrogen fuel regulations. The standard also sets limits for individual impurities; for those tables, use the standard itself.

Why it moves LCOH

Electrolytic hydrogen starts clean: its main impurities are water and oxygen, which deoxo and drying remove. A stricter grade means a deeper dew point, more purge loss and more analysis. For ammonia or refinery offtakers, a lighter spec can trim gas conditioning cost and losses.

Common mistake

Typical range

≥99.97 % hydrogen fuel index (Grade D, PEM fuel-cell road vehicles)[1][2]

Sources

  1. ISO 14687:2025 Hydrogen fuel quality: Product specification, International Organization for Standardization, 2025
  2. Hydrogen fuel regulations (Grade D hydrogen fuel index), California Department of Food and Agriculture, Division of Measurement Standards, 2024

Site Screener

Screen a site against live resource data

The free HYZEN Site Screener scores any location worldwide on solar, wind, grid access, port distance and protected areas.

Open Site Screener