On 27 October 2026, Syntholene published an independent review of its solid oxide electrolysis demo in Húsavík, Iceland. Imperial College London measured an average stack electricity use of 34.90 kWh/kg H₂, and 38.60 kWh/kg for the SOEC system excluding steam generation (Hydrocarbon Processing) [1].
Five months earlier, Topsoe said its new SOEC factory in Herning, Denmark, would prove commercial-scale manufacturing and then be hibernated "until demand is robust". It also dropped its planned US factory and cut around 440 roles (Topsoe) [2].
Both facts describe the same technology in 2026: the most electrically efficient electrolyzer on the market, and the least proven at scale. For engineers, developers and EPCs, the useful question is narrower than "SOEC vs PEM vs alkaline". It is: on this site, with this heat and this power profile, which one gives the lowest cost per kilogram you can bank?
This article puts the three technologies side by side, shows why heat decides the SOEC case, and ends with a selection checklist you can use before pre-FEED.
The three technologies side by side
The cleanest like-for-like comparison comes from the US Department of Energy, which publishes a technical-target table for each electrolyzer type using the same metrics. The figures below are DOE's 2022 status values (HTE [8], alkaline [9], PEM [10]).
| Metric (DOE 2022 status) | Alkaline (AWE) | PEM | Solid oxide (SOEC) |
|---|---|---|---|
| System electricity use (kWh/kg H₂) | 55 | 55 | 38 |
| Stack electricity use (kWh/kg H₂) | 51 | 51 | 34 |
| Stack lifetime (operating hours) | 60,000 | 40,000 | 20,000 |
| Stack degradation (%/1,000 h) | 0.17 | 0.25 | 0.50 |
| DOE 2026 target, system (kWh/kg H₂) | 52 | 51 | 36 |
Two things stand out. SOEC needs roughly 30% less electricity per kilogram at system level. And its stacks, on DOE's numbers, last a third as long as alkaline stacks and degrade about three times faster.
SOEC runs hot: 550–850 °C depending on cell design, according to a December 2025 review by Riegraf and co-authors (arXiv) [11]. That temperature is the source of both its advantage and its constraints. For a deeper look at the two low-temperature options, see our AWE vs PEM utility-scale comparison.
Heat decides the SOEC case
At 700–850 °C, part of the energy needed to split water can come from heat instead of electricity. That is why the headline SOEC numbers assume steam is supplied, and why the Syntholene system figure explicitly excludes steam generation.
The Riegraf review quantifies what happens when that steam has to be made electrically [11]:
| Steam source | SOEC system efficiency (% LHV, AC) |
|---|---|
| Excess heat from a downstream process | 85–89% |
| Internal heat recovery covering one-third of steam | 77–81% |
| Fully electric steam generation | 73–77% |
Fully electric steam costs 12.5 percentage points or more, about 6.6 kWh/kg H₂. That erases a large share of the advantage over low-temperature electrolysis.
Vendors frame it the same way. Topsoe says its SOEC electrolyzers are 15–20% more efficient than alkaline machines, and up to 30% with waste heat. In its words, 800 MW of SOEC would produce roughly the hydrogen of a 1 GW alkaline project from the same renewable input, or 700 MW with waste heat (Topsoe) [5]. Those are manufacturer claims, not independent measurements.
Where is the heat? The 2026 references point to four places:
- Ammonia synthesis. Topsoe says waste heat is always available in ammonia projects [5]. Our green ammonia LCOA methodology shows where that heat sits in the plant balance.
- Refineries. Sunfire's 2.6 MW MultiPLHY unit at Neste's Rotterdam refinery produces more than 60 kg/h at 850 °C. Sunfire reports up to 84% LHV,AC efficiency from its first-generation units and expects 89% from its third generation (Sunfire) [6].
- E-fuels. The Riegraf review ties the 85%+ efficiency case to excess heat from exothermic downstream processes [11], which is the profile of e-fuel synthesis.
- Geothermal. Syntholene's Icelandic demo uses geothermal heat and geothermal electricity [1].
If your site has none of these, SOEC is competing with one hand tied behind its back.
Where SOEC still struggles: variable power and stack life
Most green hydrogen projects are built around solar and wind. That is where SOEC's thermal nature becomes a design constraint. The Riegraf review gives the key figures [11]:
- Cold start: 36 hours from standby for Sunfire's 720 kW system in Salzgitter. Reheating typically runs at 1–2 K/min.
- Hot start: Topsoe and Bloom Energy specify 10 minutes, but only if the stack is kept hot.
- Hot standby cost: about 3% of full-load electricity for Topsoe's 350 kW system and 1.6% for Sunfire's 10.7 MW system.
- Ramp rate: a nominal 10%/min from Sunfire, Topsoe and Bloom, often limited by balance-of-plant equipment rather than the stack.
- Minimum load: isothermal part load down to 5% has been shown, but Sunfire's 10.7 MW system operates only down to 50%.
In practice, SOEC wants steady power and a hot stack. On a direct-coupled solar plant, that means firming the supply with batteries, the grid or a hybrid renewable profile. Our articles on battery storage for green hydrogen and hybrid solar-wind capacity factor cover those trade-offs.
Stack life is the second constraint. DOE's 2022 status puts SOEC degradation at 0.50%/1,000 h [8]. The Riegraf review says 0.5%/kh is now routine for major stacks, with values as low as 0.1%/kh demonstrated; alkaline and PEM sit at 0.1–0.2%/kh [11]. Stack vendor Dynelectro reports 0.05%/1,000 h over a 25,000-hour laboratory campaign [1]. Topsoe itself acknowledges that its ceramic stacks must be replaced every few years, much more often than alkaline stacks [5].
The review also notes an offsetting effect: low-temperature systems lose 6–7 percentage points of efficiency from beginning to end of life, while no such decline is typically observed for SOEC [11]. Model both stack replacement and end-of-life efficiency before comparing. Our electrolyzer degradation rate article shows how.
The 2026 market reality: alkaline volume, SOEC demonstrations
The market has not waited for SOEC. Installed electrolysis capacity doubled in 2025 to more than 4 GW (IEA) [12]. Global manufacturing capacity reached nearly 58 GW/yr at end-2025, about 60% of it in China, with utilisation around 9% (Argus) [13].
Price is the other pressure. The IEA puts a Chinese-made electrolyzer installed in China at $500–1,100/kW in 2025, against $1,900–2,500/kW for systems made outside China [13]. We unpacked that gap in Chinese electrolyzer cost vs Western.
The 2026 SOEC timeline reads like a technology still finding its first commercial customers:
| Date | Event |
|---|---|
| Oct 2025 | Topsoe opens its Herning SOEC factory, initially designed for 500 MW/yr, with €94m from the EU Innovation Fund (Topsoe) [3] |
| Jan 2026 | Sunfire, itself an SOEC developer, wins 200 MW of pressurized alkaline orders from Repsol for Cartagena and Bilbao, commissioning in 2029 (Sunfire) [7] |
| Mar 2026 | Topsoe's 100 MW SOEC supply deal for First Ammonia's Texas project terminates after a missed milestone; a 50 MW agreement with Forestal stands (Topsoe) [4] |
| May 2026 | Topsoe will hibernate Herning after proving manufacturing, books DKK 3,500–3,900m in one-off costs including Power-to-X impairments [2] |
| Oct 2026 | Imperial College review confirms 34.90 kWh/kg stack electricity use at Syntholene's Icelandic demo [1] |
The Sunfire order is the telling one. Faced with two 100 MW refinery projects, each expected to produce up to 15,000 t/yr, the buyer chose proven alkaline modules [7].
Which technology fits your project: a 2026 checklist
No technology wins everywhere. Use this as a first screen, then confirm it with a site-specific energy balance.
| Your project looks like... | Start your evaluation with | Why |
|---|---|---|
| Large, variable solar or wind, capex-driven | Alkaline (atmospheric or pressurized) | Lowest stack degradation and longest stack lifetime on DOE data |
| Highly variable power, small plot, pressure needed | PEM | Compare against AWE on your own profile |
| Ammonia, e-fuel or refinery integration with steady surplus heat | SOEC, as a pilot or phased train | 85–89% efficiency with excess-heat steam |
| First-of-a-kind, lender-sensitive financing | The technology with operating references at your scale | SOEC systems in the literature reach about 10 MW; AWE orders now reach 100 MW per plant |
Before any vendor shortlist, ask each supplier the same questions:
- Electricity use in kWh/kg at beginning and end of life, at system level.
- Whether steam generation is included, and from what heat source.
- Hot standby consumption, cold-start time and minimum stable load.
- Stack replacement interval and cost, as a share of initial capex.
- Output pressure. Compressing hydrogen to 30 bar costs about 2.8 kWh/kg [11], so an atmospheric system carries that penalty downstream.
Only then compare levelized cost. A 30% efficiency gain is worth a lot at high power prices and much less where electricity is cheap but intermittent. Our analysis of electrolyzer capacity factor and LCOH shows how operating hours shift the answer.
Conclusion
SOEC in 2026 is a real technology with a narrow sweet spot. Where steady heat and steady power meet, as in ammonia, e-fuels and refining, it can cut electricity use by around 30%. Where the power is variable and the site is cold, alkaline and PEM remain the bankable default.
The decision turns on site data: heat sources, renewable profile, offtake pressure and operating hours. Hyzen's platform already models renewable input, electrolyzer sizing, water, gas conditioning, compression, storage and RFNBO checks, and the team is building the full LCOH engine on top. Start with the free Site Screener to see what your site can support.
Editorial Notes
The "about 30% less electricity" figure is our calculation from DOE's 2022 system status values (38 vs 55 kWh/kg H₂). Efficiency gains quoted by Topsoe and degradation figures reported by Dynelectro are manufacturer claims and are labelled as such.
References
[1] Hydrocarbon Processing. Syntholene receives proof-of-performance for geothermally-integrated SOEC demo facility for eFuels production. Hydrocarbon Processing (2026).
[2] Topsoe. Topsoe adjusts SOEC commercialization pathway to match market outlook; financial guidance updated. Company announcement No. 09/2026 (2026).
[3] Topsoe. Topsoe inaugurates Europe's largest SOEC manufacturing facility. Topsoe (2025).
[4] Topsoe. Supply agreements between Topsoe and First Ammonia not extended. Company announcement No. 05/2026 (2026).
[5] Topsoe / Hydrogen Insight. Interview: our solid oxide electrolysers can produce cheaper green hydrogen than Chinese alkaline machines. Topsoe (2025).
[6] Sunfire. World's largest SOEC electrolyzer started up at Neste's Rotterdam refinery. Sunfire (2025).
[7] Sunfire. Sunfire secures 200 MW electrolyzer orders in Spain. Sunfire (2026).
[8] US Department of Energy. Technical targets for high-temperature electrolysis. US DOE.
[9] US Department of Energy. Technical targets for liquid alkaline electrolysis. US DOE.
[10] US Department of Energy. Technical targets for proton exchange membrane electrolysis. US DOE.
[11] Riegraf, M. et al. Solid Oxide Electrolysis Cells: Bridging Materials Development and Process System Engineering for Gigawatt-Scale Applications. arXiv:2512.16488 (2025).
[12] IEA. Global Hydrogen Review 2026: Production. IEA (2026).
[13] Argus Media. Green H2 electrolyser sector enters consolidation: IEA. Argus (2026).